Storm Water Update e-News
 
SWPPP Services
Erosion Control Solutions SWPPP Services Storm Water Quality  
SWPPP Documentation
SWPPP Implementation
SWPPP Compliance Assurance
Outsourcing the SWPPP Burden
SWPPP BMP Resources
SWPPP Compliance Services: Benefits & Deliverables
   
SWPPP BMP Resources
SWPPP Documentation Resources
Offloading the SWPPP Burden: How it works...
  • When you notify us of a new project, we'll review the Civil Drawings for the project, including the SWPPP Site Plan.

  • We'll provide a lump sum price with unit prices for the controls called for, as well as breakdowns for providing the SWPPP Narrative Plan, and our full Compliance Assurance Program.

  • We'll visit the site and review the SWPPP Site Plan against the realities we find there.

  • If the Owner has provided an SWPPP Narrative Plan, we'll review it searching for cost savings and/or gaping holes. We'll insure that the SWPPP and recordkeeping system that reaches the site is properly site-specific and complete, and that it contains no 'spec book' SWPPP traps.

  • If the SWPPP Narrative Plan needs to be developed, we'll create a site-specific plan that's complete, cost-effective and fully documented.

  • We'll gather the necessary information and fill out the Notice of Intent (NOI), or Site Notice - as required by site specifics, preparing it for your signature---and delivery to the TCEQ, in the case of an NOI.

  • We'll notify the MS4 serving your site, as required by TCEQ regulations.

  • We'll provide and install SWPPP purpose-specific signage and regulatory postings that help make your site a model of compliance, prior to start of construction

  • Our trained installation crews will implement the plan, installing controls required prior to start of construction, and the phase-determined controls, as they are required.

  • Our qualified site inspector will make weekly inspections, getting to know your site personnel and building a working relationship that insures successful compliance.

  • He'll file those inspection reports in the SWPPP, letting the Superintendent know what was found and what, needs to be done to maintain compliance (a copy can go to your project management team, if desired).

  • We'll modify the SWPPP as the project progresses and modifications are needed to reflect site changes.

  • We'll be there to offer training and advice when required, and on call to help with the compliance officer when you're visited.

  • And when the project is complete, we'll prepare the Notice Of Termination (NOT) for filing with the TCEQ.

SWPPP and TPDES compliance in three easy pieces: Documentation, Implementation and Compliance Assurance. A helpful, focused team of specialists operating on your behalf to get this job done will lighten your load, and lower your costs.

Ask us to prove it.

For more information on this subject, please contact us at 832.456.1000.

Resources | Storm Water Update e-News | Our Principles | Management | Affiliations | Contact Information | Home
Copyright © 2006 Construction EcoServices
1930 Aldine Western Road , Houston, TX 77038• 832.456.1000