FULL SWPPP SERVICES & STRUCTURAL CONTROLS LIST

SWPPP NARRATIVE SERVICES

STARTUP SERVICE

  1. Complete and post your Construction Site Notice (CSN)/TCEQ Notice of Intent (NOI, does not include permit fee).
  2. Submit to relevant MS4 operator, a copy of your CSN/NOI to meet notification requirements.
  3. Provide and install purpose specific SWPPP posting signage onsite for your CSN/NOI.
  4. Complete and submit your MS4 notification and/or Notice of Termination upon final stabilization.

SWPPP NARRATIVE PLAN DEVELOPMENT

  1. Independent research regarding all required site-specific elements.
  2. Gathering of maps, plans and other correlating materials.
  3. Incorporation of specific local additions to regulatory requirements and eliminating those not required by law.
  4. Compiled in a 3-Ring binder designed for jobsite use.

OTHER SWPPP DOCUMENTATION SERVICES

  1. SECONDARY OPERATOR FILINGS
  • As per Texas General Permit to fulfill Secondary Operator (typically OWNER) requirements.
  • Included with Large Construction Site (5 AC and greater and/or Larger Plan of Common Development).
  • Not required for Small Construction Site (1 AC – 4.99 AC), additional fee if requested.
  1. EXTRA SWPPP NARRATIVE HARD COPY
  • Please Note: Some MS4 agencies require a hard copy submittal.
  1. LARGE CONSTRUCTION SITE – NOI PERMITTING
  • Payable to State
  • CES recommends electronic submittal through STEERS for faster Compliance Assurance.
  1. SMALL CONSTRUCTION SITE – NOI PERMITTING NOT REQUIRED (NO EXTRA FEES)
  2. CPESC STAMP – IF REQUIRED BY LOCAL MS4
  3. 2023 TCEQ (Texas General Permit Renewal)
  • Permit renews every 5 years (2018 previous renewal), processing fees may be applicable.

SWPPP COMPLIANCE ASSURANCE PLAN (CAP)

INSPECTION SERVICES

  1. Initial site visit by our Project Managers to assess and discuss potential value engineering opportunities.
  2. SWPPP orientation discussion on your behalf, at Pre-Construction meeting with other sub-contractors, upon request.
  3. TPDES mandatory certified site inspections by our CISEC qualified inspectors, on a regularly scheduled weekly cycle.
  4. Weekly communication with Project Superintendent, as to action items required to maintain SWPPP compliance.
  5. Findings of site inspections recorded in the SWPPP during the project.
  6. Regular modification of SWPPP Narrative as needed, to meet SWPPP ‘living document’ requirements.
  7. Provide regular consultation, recommendations, and solutions to TPDES related compliance issues throughout the site.
  8. Ongoing SWPPP education, information, and informal training at the jobsite as needed.
  9. On-call support and mediation in conversations with visiting regulatory compliance officers.
  10. Priority scheduling for BMP installation (vs. non-CAP turnkey projects).

NOTE: Monthly Inspection Services charge incurred until final stabilization or termination; only in actual period when inspections are performed.

STRUCTURAL CONTROLS

INLET PROTECTION BARRIERS (IPB)

  • GRATE GATOR (AREA DRAIN IPB) – Type A or B Inlet Protection.
  • ECONOGRATE GATOR (AREA DRAIN IPB) – Economical Type A Inlet Protection.
  • GEOCURVE (CURB IPB) – Type C Inlet Protection.
  • TRENCH DRAIN INLET PROTECTION – Trench style Type A Inlet Protection.
  • NONWOVEN INLET PROTECTION – Landscape or Small Garden Inlet Protection.

NOTE: Inlet Protection Maintenance or Removal at additional rate.

FLOW CONTROL BARRIERS

  • ROCK FILTER DAMS TYPE 1 (NON-REINFORCED) – 3″x 5″ crushed Limestone laid to form: Height 18″ x Top Width 2′.
  • ROCK FILTER DAMS TYPE 2 – 3″x 5″ Limestone laid in heavy duty wire mesh. Height 18″ x Top Width 2′.
  • ROCK FILTER DAMS TYPE 3 – 4″x 8” Limestone laid in heavy duty wire mesh. Height 36″ x Top Width 2′.
  • EROSION EELS – Heavy duty Geotextile Fabric w/Recycled Rubber Tire material fill.
  • MULCH SOCK – Biodegradable sock comprised of recycled wood materials.
  • HAY BALE BARRIERS – 3’x18″x18″ Hay Bales staked in with steel t-posts and wired in place.

NOTE:  Flow Control Barrier Maintenance or Removal at additional Rate.

STABILIZED CONSTRUCTION EXIT (SCE)

  • STANDARD – 25 tons of 3″x 5″ Crushed Limestone over woven geotextile (12’ x 50’).
  • CATTLE GUARD – 16’Wx8′ L grating w/2 concrete beams. Includes excavation, set-up, and digging of side trench/sump.

NOTE: Construction ECO Services DOES NOT maintain SCE/Cattle Guards or remove Rock from Job Site.

PERIMETER CONTROL

  • REINFORCED FILTER FABRIC FENCE (RFB) – High grade fabric w/wire mesh reinforcement & steel t-posts on 6′ centers.
  • FILTER FABRIC FENCE WITH ROCK ANCHOR – Attached to existing chain-link fence & tail is anchored w/ washed rock.
  • REINFORCED NON-WOVEN FABRIC FENCE – Non-Woven Fabric w/wire mesh Reinforcement.
  • TRIANGULAR FILTER DIKE – Urethane Foam Triangular unit wrapped in Filter Fabric, either anchored or adhesive.
  • T-POST CAPS/SAFETY T-POST CAPS – Molded White Rubber Caps or Orange OSHA approved Plastic Caps.

NOTE:  Filter Fabric Fence Maintenance or Removal at additional rate.

ADDITIONAL SERVICES

  • LOCKBOX, WEATHERPROOF DOCUMENT STORAGE – SWPPP Book storage unit if no Construction Trailer on site.
  • CONCRETE WASHOUT (ALL WEATHER) – Heavy-Duty Woven Poly Propylene Unit. 33 CY/260-Gal capacity.

NOTE: Construction Eco Services does NOT maintain these Washout units.

  • CLEARING/SITE PREP – Clearing service at a daily rate for heavily brushed/wooded areas where Perimeter Protection controls are indicated to be installed.
  • TREE PROTECTION FENCING – Chain Link OR Orange Safety Fence installed on 6′ t-posts.
  • DEWATERING BAGS (DIRT BAGS) – Filter bags for pumping water from jobsite. (Multiple Sizes Available).
  • SITE SPECIFIC TRAINING/BADGING – Applicable training/badging to be able to access/perform work on site.
  • STABILIZATION SERVICES
  1. Water/Meter not included in hydromulch or irrigation applications.
  2. Total hydromulch applications assumed in 1 mobilization, additional mobilizations extra if necessary.
  3. Sustainable Growth Guarantee if Stabilization Services are fully utilized.