3-Alarm Disaster of a Detention Pond Gets Remediated
Fire Department looks to the Construction EcoServices and Jacobs Engineering team to renovate their detention pond and bring it back to fully operational status.
...Having worked on thousands of commercial construction projects with General Contractors and Engineers since 2002, Construction EcoServices is keenly aware of the importance regarding erosion control, turf establishment and slope stabilization. Utilizing the latest technologies available in Hydraulically Applied Erosion Control Blankets, permanent Turf Reinforcement Mats, advanced mulch products, and more, Construction EcoServices can guarantee results that resist erosion and enhance property and project value.
Let us assist you in achieving your objectives…


“Actually, more of a ‘system’ than a product, Green Armor is the combination of Futerra Permanent Turf Reinforcement Mat (TRM) and Flexterra Flexible Growth Medium. Futerra’s open and lofty matrix design is ideal to be in-filled with Flexterra. This overcomes the slow grow-in of virtually all other TRMs where the mat is installed over the mulch. The tight weave of competing TRMs forces the grass to fight its way through the product, instead of growing from within the mat itself. With three different weights of Futerra, plus R-45 High Performance TRM, Green Armor is highly effective in applications with water velocities up to 30 feet per second and is 30-50% less costly than hard armor.”
John Moss
Director of Business Development
About GreenArmorA revolutionary green alternative to hard armor.
As the world’s most effective Green Design Engineering™ alternative to hard armor, the GreenArmor™ System offers a more aesthetically pleasing and environmentally superior means of protecting high-discharge waterways and steep slopes. You can learn about keys to the system here. You will see that they bring together the most technologically advanced erosion control and revegetation products to provide excellent benefits.
Watch how the components come together.






Fire Department looks to the Construction EcoServices and Jacobs Engineering team to renovate their detention pond and bring it back to fully operational status.
...It was the flood water forces resulting from Hurricane Harvey that damaged both the hillside and building to the extent that the building needed to be closed.
...Many Low Impact Development Practices were used, including bioretention, bioswales, vegetated structural roadway shoulders, permeable pavers and rainwater harvesting and reuse.
...The LID solution nearly eliminate a detention pond and in the process gained three additional lots, or 15% more homes
...I believe I started using your firm back in 2004/05, and haven’t ever regretted that decision.
ECO is well organized, detailed-oriented and has remarkable responsiveness when service requests are needed. In all our diversity we depend highly on. ECO to maintain their responsibilities they have become one of our most valuable and dependable assets of our organization for over eight consecutive years.
They are the first call I make when I need cutting edge information on green infrastructure implementation options and resources and they have always been willing and able to help.
WT Byler trusts the knowledge and expertise of Construction EcoServices for Stormwater Compliance on our projects.